[1]MARAD, Nuclear Ship Savannah License Termination Plan (submitted to NRC Oct 23, 2023), ADAMS ML23298A041 [marad_nrc]
- Locator
- LTP S 2.3.5 (report CR-109)
- Finding type
- abatement_record
- Finding
- MARAD's License Termination Plan documents that asbestos insulation was removed from components in the containment vessel as a prerequisite for the 2019-2020 radiological characterization campaign.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-14
- Study period
- 2019-2020
- Population
- DECON contractor personnel performing ACM removal
- Limitations
- Licensee's own federal filing; ship-specific and direct. Scope is limited to the components characterized in that campaign - does not itemize original installed quantities or ACM elsewhere aboard.
- Atlas source
- true
- Evidence ID
- ev-ns-savannah-01
-
[2]MARAD, Nuclear Ship Savannah License Termination Plan, ADAMS ML23298A041 [marad_nrc]
- Locator
- LTP S 2.3.8
- Finding type
- abatement_record
- Finding
- A 2022 detailed survey of engine-room steam, condensate, and feedwater systems included removal of asbestos-containing insulation materials as a prerequisite activity.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-14
- Study period
- 2022
- Population
- DECON contractor personnel performing ACM removal
- Limitations
- Ship-specific abatement record. Does not itemize original installed quantities and does not establish that all ACM aboard was removed.
- Atlas source
- true
- Evidence ID
- ev-ns-savannah-02
-
[3]MARAD, Nuclear Ship Savannah License Termination Plan, ADAMS ML23298A041 (shipbreaking end-state analysis) [marad_nrc]
- Locator
- LTP shipbreaking end-state / remediation-worker scenario section
- Finding type
- regulatory
- Finding
- The LTP's shipbreaking end-state analysis treats asbestos removal as a defined first work phase: the remediation-worker scenario covers removal of fuels, oils, PCBs, asbestos, and combustible materials from components and pipes before cutting.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-14
- Study period
- 2023 (LTP submittal)
- Population
- Prospective shipbreaking remediation workers
- Limitations
- Forward-planning analysis, not a finding of current quantities; confirms residual ACM is presumed pending final disposition. Does not establish exposure for any individual.
- Atlas source
- true
- Evidence ID
- ev-ns-savannah-03
-
[4]Library of Congress, HAER DC-64, N.S. Savannah (recordation 2007-2018) [haer]
- Locator
- HAER DC-64 written history (LOC item dc1047)
- Finding type
- asbestos_application
- Finding
- Savannah was built 1958-61 at New York Shipbuilding, Camden, with a conventional steam auxiliary plant alongside the nuclear plant - peak-era marine asbestos use for insulation, gasketing, and deck/bulkhead materials.
- Verification
- inferred
- Role
- supporting
- Documentation level
- class_or_era
- Accessed
- 2026-09-14
- Study period
- 1958-1961
- Population
- Construction trades (1958-61); operating crew (1962-70)
- Limitations
- Class-era inference from build date, yard, and steam-plant type; the LTP does not itemize original installed asbestos. Not hull-quantified; does not establish what remains aboard.
- Atlas source
- true
- Evidence ID
- ev-ns-savannah-04
-
[5]Federal Register, NRC environmental assessment and FONSI on the NS Savannah License Termination Plan (Dec 30, 2024); NRC NSS decommissioning page (Docket 50-238, License NS-1) [federal_register]
- Locator
- 89 FR (Dec 30, 2024), 2024-30982; https://www.nrc.gov/info-finder/decommissioning/power-reactor/nuclear-ship-savannah
- Finding type
- regulatory
- Finding
- NRC noticed its environmental assessment/FONSI for the Savannah LTP on Dec 30, 2024; the ship is under DECON with reactor pressure vessel removed Nov 8, 2022 (disposed at EnergySolutions, Clive UT) and a statutory license-termination deadline of Dec 3, 2031.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-14
- Study period
- 2022-2024
- Population
- DECON program personnel
- Limitations
- Regulatory status documentation - establishes decommissioning posture and dates, not asbestos quantities or exposure for any individual. Asbestos detail lives in the LTP, not the EA.
- Atlas source
- true
- Evidence ID
- ev-ns-savannah-05