USS Alabama (SSBN-731)

Name
USS Alabama
Hull designation
SSBN-731
Vessel class
Ohio class
Evidence tier
Tier 2
Evidence entries
10
Record ID
uss-alabama-ssbn731
Dataset version
2026.10.12-rc.1
Canonical URL
https://asbestosatlas.org/ships/uss-alabama-ssbn731

Evidence

10 evidence entries recorded; each entry has a stable permalink (#ev-1 … #ev-10).

  1. [1]DANFS 'Alabama IV (SSBN-731)' entry; live NHHC page unavailable - Internet Archive Wayback capture (2005-05-26) of the official history.navy.mil DANFS page used [nhhc_danfs]
    Locator
    DANFS Alabama IV (SSBN-731) characteristics block and narrative
    Finding type
    vessel_history
    Finding
    Documented for this hull (DANFS): fourth Alabama (SSBN-731) laid down 14 October 1980 at Groton, Conn., by Electric Boat Division of General Dynamics Corp.; launched 19 May 1984, sponsored by Mrs. Barbara E. Dickinson; commissioned at the Submarine Base, New London, 25 May 1985, Capt. Wade H. Taylor (Blue Crew) and Capt. Malcolm S. Wright (Gold Crew) in command. Spec block: 16,000 t surfaced / 18,750 t submerged, 560' x 42' x 35.5', 20+ kts, complement 133, 24 Trident missiles and four 21-inch torpedo tubes, Ohio class. Post-commissioning: shakedown off Florida (Gold Crew took over at Port Canaveral 22 July 1985); post-shakedown availability at Electric Boat until mid-December 1985; sea trials in Narragansett Bay; sound trials in the Bahamas completed 30 January 1986; Mobile, Ala. visit 2-11 February 1986; Panama Canal transit 17 February; arrived Bangor, Wash., 6 March 1986; first deterrent patrol mid-May 1986; four deterrent patrols in the last seven months of 1986; undergoing refit at Pearl Harbor as of early 1987.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Study period
    1980-1987
    Population
    crew of USS Alabama (two alternating Blue/Gold crews; DANFS complement 133)
    Limitations
    Service-history source only; contains no asbestos, materials, or exposure information. The DANFS spec-block complement (133) and draft (35.5 ft) differ from NVR/CSP figures - conflicts disclosed, not normalized. Cited URL is a 2005 Wayback capture of the official old-format DANFS page.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-01
  2. [2]Naval Vessel Register, SHIPSDETAIL_SSBN_731 (retrieved via Internet Archive Wayback capture 2024-06-07) [other_primary]
    Locator
    NVR SHIPSDETAIL milestone, status, and characteristics fields
    Finding type
    historical_record
    Finding
    Official NVR record: ALABAMA (SSBN 731), class SSBN 726 (Ohio); award date 02/27/1978; keel date 08/27/1981 (conflicts with DANFS/CSP 14 October 1980 - see correction row ev-08); launch 05/19/1984; delivery 04/23/1985; commission 05/25/1985; status active, in commission; U.S. Pacific Fleet; homeport Bangor, WA; builder General Dynamics Electric Boat; steel hull; one propeller; propulsion steam turbine (nuclear); accommodations 13 officers + 140 enlisted; record last updated 12/05/2019.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Study period
    register snapshot, last updated 12/05/2019
    Limitations
    Milestone/status register only; NVR carries no asbestos or materials data. NVR keel date (08/27/1981) conflicts with DANFS and CSP (10/14/1980). Archived snapshot may not reflect post-2019 amendments.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-02
  3. [3]Commander, Submarine Force, U.S. Pacific Fleet - USS Alabama (SSBN 731) About page (retrieved via Internet Archive Wayback capture 2018-02-21) [other_primary]
    Locator
    CSP About narrative and Boat Characteristics block
    Finding type
    vessel_history
    Finding
    Official COMSUBPAC page for this hull: sixth submarine of the Ohio class and the fifth U.S. Navy ship to bear the name Alabama; keel laid 14 October 1980; first crew formed July 1983; christened 19 May 1984 at Groton by Mrs. Barbara Dickinson, wife of U.S. Rep. William L. Dickinson; following successful sea trials in April 1985, commissioned 25 May 1985 at Naval Underwater Systems Center, New London, Conn., by Vice Adm. B.M. Kauderer (guest speakers included Rep. Dickinson, Sen. Jeremiah Denton, Adm. Kinnaird McKee, and retired Adm. Thomas H. Moorer). Originally equipped with Trident C4, later converted to Trident II D5. On 1 September 1988 completed her ninth strategic deterrent patrol, which was also the 100th deterrent patrol by a Trident submarine (ceremony led by Under Secretary of the Navy J. Lawrence Garrett III). Complement 15 officers + 140 enlisted.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Study period
    1980-1988
    Population
    crew (CSP figure 15 officers + 140 enlisted)
    Limitations
    Official Navy command page; no asbestos or materials content. CSP keel date agrees with DANFS (14 Oct 1980) against NVR (27 Aug 1981); CSP commissioning venue (Naval Underwater Systems Center) differs slightly from DANFS (Submarine Base New London).
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-03
  4. [4]DoD Inspector General, Evaluation of Nuclear Ballistic Missile Submarine (SSBN) Sustainment, Report No. DODIG-2018-127 (15 June 2018), Table 2 [other_primary]
    Locator
    DODIG-2018-127 Table 2 (ERO periods) and ERO description section
    Finding type
    historical_record
    Finding
    DoD IG evaluation lists this hull's mid-life Engineered Refueling Overhaul window: January 2006 - May 2008 (Table 2), within the class program of ~27-month EROs refueling the reactor and repairing/upgrading propulsion, ship equipment, and ballistic-missile systems; EROs are conducted at Norfolk Naval Shipyard or Puget Sound Naval Shipyard depending on the submarine's assignment (this hull was Bangor-based Pacific Fleet per NVR, consistent with PSNSY execution). Projected end-of-life June 2028.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Study period
    2006-2008 (ERO window); report dated 2018
    Population
    shipyard trades at the ERO yard (PSNSY implied by Pacific assignment - inferred, not stated per-hull)
    Limitations
    Maintenance-window documentation only; the report contains no asbestos or materials data for this hull. The ERO yard is not named per-hull in Table 2 - PSNSY is implied by the report's assignment rule and this boat's Bangor homeport, and is marked inferred.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-04
  5. [5]GAO, Navy Efforts To Protect Workers From Asbestos Exposure, HRD-80-2 (18 Oct 1979), incl. Enclosure I Attachment 1 (Navy CNO Ser 4542/318054 of 5 Jan 1979) and Note 1 [gao]
    Locator
    HRD-80-2 main text and Enclosure I Attachment 1 (TRIDENT SSBN block lists 726-730 only; hull 731 absent)
    Finding type
    gov_survey
    Finding
    Class/era federal record: GAO HRD-80-2 documents the Navy's asbestos-elimination policy - thermal-insulation product specifications changed to asbestos-free materials by late 1973; October 1975 policy (NAVSEAINST 5100.2) to remove/replace only damaged or work-required asbestos insulation, modified January 1979 to add selective replacement in high-maintenance areas; the Navy stated 'most ships delivered in the last several years or now under construction have little or no asbestos as thermal insulation,' while noting asbestos remained in applications lacking substitutes (gaskets, pipe hanger liners per Note 1; also brakes/clutches, deck tile, cabling, galley ranges per the letter text) - 'nearly impossible to build a Navy ship free of the mineral.' This hull (construction start after the attachment's cutoff) is not among the hulls listed; the TRIDENT block covers 726-730 only.
    Verification
    verified
    Role
    context
    Documentation level
    class_or_era
    Accessed
    2026-09-18
    Study period
    1979 statement on policies current at the time
    Population
    Navy shipyard workers; ships delivered since 1973 or under construction
    Limitations
    Class/era documentation only - this hull is not listed in Attachment 1, so no ship-specific insulation designation exists for SSBN-731 in this source. The era frame (post-1973 asbestos-free insulation spec, residual ACM applications) is consistent context but does not document materials aboard this hull.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-05
  6. [6]NIOSH, Health Hazard Evaluation Report HETA 78-135-1333, Electric Boat Division of General Dynamics Corp., Groton, Connecticut (August 1983) [other_primary]
    Locator
    HETA 78-135-1333 Background and Results/Discussion sections (asbestos passage)
    Finding type
    gov_survey
    Finding
    NIOSH Health Hazard Evaluation at Electric Boat Division, Groton (field visits July 1979-March 1981 - overlapping this hull's early construction): 'Historical reports of overexposure to asbestos were common among workers with eight or more years work experience at Electric Boat,' occurring 'primarily in the course of submarine overhaul and/or retrofit' performed at the Groton shipyard and a naval base in Spain; 'since the introduction of alternative forms of insulation for the reactor vessel and its complex of piping, asbestos use in the shipyard and on the submarines is slowly being phased out.' The report identifies the Trident class as one of the two submarine types manufactured at Electric Boat.
    Verification
    verified
    Role
    context
    Documentation level
    class_or_era
    Accessed
    2026-09-18
    Study period
    field investigation 1979-1981; report August 1983
    Population
    Electric Boat workers (~25,000, incl. ~1,000 painters)
    Limitations
    Yard/era documentation, not hull-specific: no hull number or materials schedule is identified. Documents that asbestos use in the yard and on submarines was being phased out during this hull's construction window - it neither establishes nor excludes ACM aboard SSBN-731.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-06
  7. [7]U.S. EPA Superfund Site Profile, Puget Sound Naval Shipyard Complex, Bremerton WA (site ID 1001107); ATSDR Public Health Assessment, Bremerton Naval Complex (16 Sep 2005) [other_primary]
    Locator
    EPA site profile - NPL milestones and site description
    Finding type
    environmental_record
    Finding
    Puget Sound Naval Shipyard Complex (Bremerton, WA) is a federal Superfund site: proposed to the National Priorities List 10 May 1993, finalized 31 May 1994; EPA/Washington Ecology documentation lists asbestos among site contaminants of concern, and ATSDR issued a public health assessment for the Bremerton Naval Complex in 2005. This hull's 2006-2008 ERO window (ev-04) was at PSNSY or NNSY per the DoD IG assignment rule; as a Bangor-based Pacific Fleet boat the PSNSY venue is inferred.
    Verification
    verified
    Role
    context
    Documentation level
    context_only
    Accessed
    2026-09-18
    Study period
    NPL listing 1993-94; site operations historical and ongoing
    Population
    PSNSY workforce and surrounding environment
    Limitations
    Yard-environment documentation only; not a record of asbestos aboard this hull. The ERO yard linkage is inferred from the DoD IG assignment rule and Pacific homeport - the per-hull yard is not stated in the cited table.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-07
  8. [8]Cross-source discrepancy: DANFS + CSP (14 Oct 1980) vs. NVR (27 Aug 1981) [other_primary]
    Locator
    NVR keel field vs. DANFS narrative and CSP About page
    Finding type
    historical_record
    Finding
    Keel-date conflict documented, not reconciled: DANFS and COMSUBPAC give 14 October 1980; NVR gives 27 August 1981. This record carries the DANFS/CSP date (14 October 1980) - the preponderance of official narrative sources - with the NVR value disclosed.
    Verification
    disputed
    Role
    correction
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Limitations
    Official Navy sources conflict by ~10 months. DANFS/CSP carried (two official narrative sources agree); NVR value disclosed. No primary keel-laying record (e.g., EB builder's record or command history) was located to resolve it.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-08
  9. [9]Negative litigation finding across CourtListener/indexed RECAP documents and verbatim search of five retrieved N.D. Cal. Exhibit A rosters (gov.uscourts.cand.192004, .197119, .199308, .204620, .204934) [court_record]
    Locator
    verbatim text search of retrieved exhibits; indexed-document name/hull-number sweeps
    Finding type
    historical_record
    Finding
    Litigation sweep result: exact-name and hull-number searches ('USS Alabama' / 'Alabama' + 'SSBN-731') across CourtListener/indexed RECAP documents and the five retrieved N.D. Cal. asbestos complaint exhibits (Halseth, Cooks, Davis, Cronin, McIntyre rosters) produced no qualifying asbestos litigation naming this hull. 'Alabama' is a high-collision name - returned hits were unrelated litigation, military matters, name collisions, or non-asbestos documents.
    Verification
    verified
    Role
    negative_finding
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Study period
    filings indexed through 2026-09-18
    Limitations
    Absence of a located pleading or opinion is not proof none exists - CourtListener coverage is not exhaustive for state-court pleadings, the API was rate-limited (HTTP 429) and public search AWS WAF-blocked this session, and non-mirrored filings are outside the sweep. High name-collision rate required discarding numerous non-qualifying 'Alabama' hits.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-09
  10. [10]Negative finding across DANFS/NHHC, NVR, CSP, DoD IG, GAO, NIOSH, EPA, and indexed litigation sources [other_primary]
    Locator
    see search_ledger sl-uss-alabama-ssbn731-01..10
    Finding type
    historical_record
    Finding
    Negative finding: no ship-specific asbestos documentation of any kind was located for USS Alabama (SSBN-731) - no hull ACM survey, abatement contract, materials schedule, hazmat disclosure, litigation roster entry, or adjudicated exposure finding. Ship-specific asbestos documentation status: UNKNOWN. Class/era context only (ev-05, ev-06).
    Verification
    verified
    Role
    negative_finding
    Documentation level
    ship_specific
    Accessed
    2026-09-18
    Limitations
    Absence of a located record is not proof no record exists. An active in-commission SSBN's detailed materials/hazmat records are not public; no FOIA-derived hull documentation was located.
    Atlas source
    true
    Evidence ID
    ev-uss-alabama-ssbn731-10

Attribution

Compiled by
Paul Danziger; Rod de Llano
Publisher
Danziger & De Llano, LLP
License
CC-BY-4.0
Citation
Danziger, P., and De Llano, R. (2026). AsbestosAtlas Navy Vessel Asbestos Exposure Dataset. Danziger & De Llano, LLP. DOI: not yet assigned
Dataset version
asbestosatlas-ships-2026.10.12-rc.1
DOI
not yet assigned