USS Cook (FF-1083)
- Name
- USS Cook
- Hull designation
- FF-1083
- Vessel class
- Knox
- Evidence tier
- Tier 2
- Evidence entries
- 13
- Record ID
uss-cook-ff1083- Dataset version
- 2026.10.12-rc.1
- Canonical URL
- https://asbestosatlas.org/ships/uss-cook-ff1083
Evidence
13 evidence entries recorded; each entry has a stable permalink (#ev-1 … #ev-13).
-
[1]research packet zbt-packet.md [other_primary]
- Finding type
- vessel_history
- Finding
- Identity packet verdict: VERIFIED
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Evidence ID
- uss-cook-ff1083-pkt-zbt-packet-md
-
[2]DANFS, Cook II (DE-1083) entry (Martin R. Waldman, 23 January 2018; live NHHC page - requires a browser user-agent, serves 404 to automated fetchers) [nhhc_danfs]
- Locator
- DANFS Cook II (DE-1083) entry, specifications block + full service narrative + commanding-officer list
- Finding type
- vessel_history
- Finding
- DANFS record for this hull (second ship named Cook, first for Lt. Cmdr. Wilmer P. Cook, USN, VA-155 A-4E pilot killed 22 December 1967): laid down 20 March 1970 at Westwego, La., by Avondale Shipyards, Inc.; launched 23 January 1971, sponsored by Mrs. Joan C. Nelson; commissioned 18 December 1971 at Boston Naval Shipyard, Cmdr. James R. Talbot Jr. in command. Specifications block: class Knox; displacement 4,200; length 438'0"; beam 46'9"; draft 24'9"; speed 27 knots; complement 242; armament 1 5-inch, 1 ASROC, 6 Mk 32 torpedo tubes, 1 helicopter. Thirteenth in a series of 26 newly designed destroyer escorts; first ship completed under the Fleet Introduction Team concept. Service per narrative: shakedown Boston-Long Beach Feb-Apr 1972 incl. assistance to burned Brazilian freighter Barao de Maua; post-shakedown availability Long Beach Naval Shipyard 26 June-10 November 1972 (BPDMS/ASROC installed, fuel system converted to Navy Distillate, LAMPS modifications); first WestPac from 9 May 1973; second WestPac December 1974 incl. Subic Bay drydock to 21 January 1975; Operation Frequent Wind April 1975 - refugee embarkation, helicopter push-overs, and escort of ~30 South Vietnamese ships to Subic (7 May 1975, ~30,000 evacuees); reclassified frigate FF-1083 on 30 June 1975; $15M baseline overhaul at Triple A Shipyard, San Francisco, from 23 September 1977 (~14 months; boiler and auxiliary-machinery overhaul, shaft rework/new propeller, Harpoon installation, SQS-26 wide-band elements; 8 December 1978 fireroom flood damaged both boilers); collision with USS Mars (AFS-1) in fog 14 May 1979 (bow crushed 20 ft; 7 injured; bow repaired at Long Beach Naval Shipyard June 1979; CO relieved); fourth WestPac Jan-Jul 1980 Indian Ocean/Battle Group Charlie (Nimitz, Virginia, Texas, William H. Standley; Hormuz patrol; Socotra intelligence ops); fifth WestPac Aug 1981-Mar 1982 Indian Ocean (Bahrain port call; Socotra); 1987 deployment with Battle Group Delta (Constellation) incl. Operation Earnest Will tanker escort and a 17 August 1987 engineering casualty dead in the water; DSRA Continental Maritime Shipyard San Diego Jan-Apr 1988 (shaft, sonar dome, hull incl. Steadfast drydock); RIMPAC '88 in Missouri (BB-63) battle group; ninth/final WestPac Feb-Aug 1989 Battle Group Romeo (Ranger); Naval Reserve Force Pacific from 1 October 1989; PMA at Continental Maritime Jan-Mar 1990 (150+ jobs incl. 1B boiler overhaul, CIWS); decommissioned Naval Station San Diego 30 April 1992; stricken 11 January 1995; transferred to the Republic of China through the Security Assistance Program 29 September 1999, renamed Hai Yang (FFG.936); retired by ROCN May 2015. Namesake memorial aboard 24 November 1989 and ashes committed to the Pacific from her deck 27 November 1989.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1970-2015
- Population
- Avondale Shipyards construction trades 1970-71; crew 1971-1992 (design complement 242); yard workers at Long Beach NSY (1972, 1979), Triple A Shipyard (1977-79), Continental Maritime (1988, 1990)
- Limitations
- DANFS documents identity, specifications, service history, and yard periods - it contains no materials or asbestos information. Entry was published 2018 and does not cover the 2020 target sinking. Page requires a browser user-agent (404 to scripts).
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-01
-
[3]Naval Vessel Register ship detail, COOK (FF 1083), ex-DE 1083 (NVR/NAVSEA official inventory; live NVR drops disposed hulls - Wayback capture 2020-12-04 cited) [other_primary]
- Locator
- NVR ship detail page, VESSEL STATUS + MILESTONE DATES + PHYSICAL CHARACTERISTICS + PROGRAM CHARACTERISTICS blocks (Wayback capture)
- Finding type
- vessel_history
- Finding
- Official NVR record for this hull: class FF 1052 (Knox); UIC 20054; builder 'Avondale Industries'; award 25 August 1966; keel 20 March 1970; launch 23 January 1971; delivery 9 December 1971; commission 18 December 1971; decommission 30 April 1992; stricken 11 January 1995; 21.0 years commission-to-decommission; status 'Disposed of through the Security Assistance Program (SAP), transferred, cash sale, ex-US fleet hull foreign military sale case number assigned' with status-change date 29 September 1999 and custodian TAIWAN; record last updated 23 January 2006. Physical characteristics: LOA 438 ft, waterline 415 ft, extreme beam 47 ft, max navigational draft 25 ft, light displacement 3,201 tons, full 4,182 tons; steel hull, aluminum superstructure; 1 propeller; steam turbines; accommodations 22 officers + 264 enlisted.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1966-2006
- Population
- Crew 1971-1992; NAVSEA/inactive-ships custody 1992-1999; ROC Navy custody from 1994/1999
- Limitations
- NVR confirms official milestone dates, dimensions, and the SAP/FMS disposal path and date - it contains no materials, asbestos, or work-scope information. Does not record the 31 May 1994 lease (NavSource) or the 2020 sinking; Taiwan custodianship is the last entry.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-02
-
[4]NavSource Online: Destroyer Escort Photo Archive, USS Cook (DE 1083) page - specifications block and Building and Operational Data [other_primary]
- Locator
- NavSource DE-1083 page, specifications block + 'Building and Operational Data' chronology + commanding-officer table
- Finding type
- vessel_history
- Finding
- NavSource data sheet for this hull: class Knox (SCB No. 199C / 1964; 46 ships); 3,020 tons standard / 4,065 tons full; 415 ft waterline / 438 ft overall; beam 46'9" extreme; draft 24'9" limit. Building/operational milestones: contract awarded to Avondale Shipyard Corp. 25 August 1966; keel laid 20 March 1970 at Westwego, La.; launched 23 January 1971; commissioned at the Boston Naval Shipyard 18 December 1971, Cmdr. James R. Talbot in command, assigned Destroyer Squadron 3 at Long Beach; first WestPac 9 May 1973 (DesRon 9); reclassified frigate FF-1083 on 30 June 1975; DesRon 15 from 1 February 1979; collided with USS Mars (AFS-1) in heavy fog 14 May 1979; Naval Reserve Force, Pacific, San Diego from 1 October 1989; decommissioned Naval Station San Diego 30 April 1992; struck from the NVR 11 January 1995; leased to Taiwan 31 May 1994 and renamed ROCS Hae Yang (FF-936); decommissioned by the Taiwanese Navy 1 May 2014 (conflicts with DANFS/other 2015 reading - see gaps); sunk by bombs and missiles 1 July 2020 during an ROCN anti-ship live-fire exercise off southeastern Taiwan. Commanding-officer list (10 names incl. acting Lt. Cmdr. Martin J. Mayer 1979) corroborates the DANFS roster.
- Verification
- partial
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1966-2020
- Population
- Crew 1971-1992; ROC Navy crew 1994-2015
- Limitations
- Secondary compiled archive (volunteer photo/data archive mirroring official ship data sheets) - cited for the 30 June 1975 reclassification, the 31 May 1994 lease date, the ROCN service/retirement dates, and the 2020 sinking; all reconcile against DANFS/NVR except the 2014-vs-2015 ROCN decommissioning year, carried in gaps. No asbestos or materials content.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-03
-
[5]DANFS, Cook II (DE-1083) service narrative - documented yard periods on this hull (Long Beach NSY 1972 and 1979; Subic Bay drydock 1975; Triple A Shipyard baseline overhaul 1977-79; Continental Maritime DSRA 1988 and PMA 1990) [nhhc_danfs]
- Locator
- DANFS Cook II (DE-1083) entry, service narrative (1972, 1975, 1977-79, 1979, 1988, 1990, 1992 yard/maintenance events)
- Finding type
- vessel_history
- Finding
- DANFS documents repeated yard periods on this hull, several with boiler scope: post-shakedown availability at Long Beach Naval Shipyard 26 June-10 November 1972; drydocking at Subic Bay through 21 January 1975; a $15 million baseline overhaul at Triple A Shipyard, San Francisco, from 23 September 1977 lasting nearly fourteen months and expressly including 'an overhaul of the boilers and associated auxiliary machinery,' a shaft rework with new propeller, and a fireroom flood (8 December 1978) that damaged both boilers; collision-repair availability at Long Beach Naval Shipyard June 1979 (bow reconstruction after the Mars collision); a drydocking selected restricted availability at Continental Maritime Shipyard, San Diego, 18 January-23 April 1988 (with drydock work on shaft, sonar dome, and hull at Steadfast); a planned maintenance availability at Continental Maritime 16 January-27 March 1990 including 'an overhaul of 1B boiler'; and the decommissioning availability from 27 January 1992.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1972-1992
- Population
- Long Beach NSY workers 1972 and 1979; Triple A Shipyard workers 1977-79; Continental Maritime workers 1988 and 1990; Subic Bay yard workers 1975; ship's force engineering ratings throughout
- Limitations
- Ship-specific yard-period documentation only - the entry says nothing about asbestos, insulation, or abatement. Boiler overhaul and drydock work on a 1,200-psi steam plant is the classic insulation-disturbance pathway, and the Navy's contemporaneous policy (GAO HRD-80-2) coupled asbestos replacement to repair work, but whether ACM was disturbed, removed, or retained aboard this hull in any yard period is undocumented.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-04
-
[6]NavSource DE-1083 specifications block + Knox-class standard plant (2 x 1,200-psi boilers, 1 Westinghouse geared turbine, 35,000 shp) + GAO HRD-80-2 (Navy asbestos-specification timeline) + Atlas shipyard dataset, avondale-shipyard record [other_primary]
- Locator
- NavSource DE-1083 specifications block; GAO product page HRD-80-2; shipyards.json record 'avondale-shipyard'
- Finding type
- asbestos_application
- Finding
- Era/class inference: a steam ocean escort built 1970-1971 at Avondale Shipyards with the Knox-class standard plant (two 1,200-psi pressure-fired boilers, one Westinghouse geared turbine, 35,000 shp, single shaft; compiled class specs) was delivered 9 December 1971 - before the Navy's insulation-specification revisions (begun 1971, consolidated by late 1973) and the October 1975 policy eliminating asbestos as an acceptable thermal-insulation material (GAO HRD-80-2). Era-standard applications included boiler casing and fireroom insulation, steam-pipe lagging, turbine lagging, valve and flange gaskets and packing, bulkhead/overhead fireproofing, deck coverings, and cable insulation. Builder Avondale Shipyard is a tier-2 asbestos-documented yard in the Atlas dataset (Kaylo insulation, steam-pipe lagging cloth, gaskets, floor tiles, adhesives, fire-resistant blankets; multiple federal opinions and a NIOSH HHE).
- Verification
- inferred
- Role
- supporting
- Documentation level
- class_or_era
- Accessed
- 2026-09-29
- Study period
- 1970-2015
- Population
- Avondale Shipyards construction trades 1970-71; engineering crew 1971-92; ROCN engineering crew 1994-2015
- Limitations
- Class/era and builder-yard inference only - no hull-specific insulation survey, specification extract, work package, or product identification was located. Names era-standard applications, not confirmed installed materials on this hull; establishes no quantity and nothing about what was removed or remained through Taiwan service. A ship delivered December 1971 sits before the Navy's documented spec consolidation, which supports - but does not prove - as-built asbestos thermal insulation.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-05
-
[7]GAO, Navy Efforts To Protect Workers From Asbestos Exposure, HRD-80-2 (Oct 18, 1979) [gao]
- Locator
- GAO product page HRD-80-2 + search-indexed PDF excerpts (October 1975 policy; January 1979 modification; ~$2B estimate)
- Finding type
- gov_survey
- Finding
- GAO documented the Navy's asbestos-protection program during this ship's service era: per the report's product-page summary and search-indexed text, the Navy's October 1975 standing policy removed and replaced asbestos insulation only when damaged or required to accomplish necessary repairs; in January 1979 the policy was modified to selectively replace asbestos insulation in high-maintenance areas where repairs would be expected during a ship's next operating cycle; and the Navy declined a one-time removal program (estimated $2 billion) on a cost-benefit basis - meaning original-era insulation typically remained in place unless a yard period disturbed it. The review's fieldwork covered Long Beach and Norfolk Naval Shipyards; Cook had documented Long Beach NSY availabilities in 1972 and 1979.
- Verification
- verified
- Role
- context
- Documentation level
- class_or_era
- Accessed
- 2026-09-29
- Study period
- 1979
- Population
- Navy shipyard workers; asbestos program review
- Limitations
- Program-level documentation; Long Beach NSY was a GAO fieldwork site and Cook did undergo two availabilities there, but the report contains no ship-specific findings for this hull. Full text not retrieved (gao.gov blocks automated fetch, HTTP 403) - description via product page and search-indexed excerpts; the report's per-class appendix figures were not independently verified this session.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-06
-
[8]Liberty Times (LTN), 'Han Kuang exercise: target ship Hai Yang sunk, Chi Yang takes over' (2020) + ROC Ministry of National Defense English press release on Han Kuang-36 live fire (15 July 2020) [reputable_press]
- Locator
- LTN political/news pages (2020-07); mnd.gov.tw press release 2020-07-15
- Finding type
- vessel_history
- Finding
- Contemporaneous Taiwanese reporting documents this hull's final disposition: the decommissioned ex-Knox-class frigate Hai Yang (pennant 936, ex-USS Cook FF-1083) was towed to waters off southeastern Taiwan in late June 2020 and sank on 1 July 2020 during Han Kuang-36 live-fire pre-exercise, reportedly under F-16V-dropped Mk-84 2,000-lb bombs (sank ~1448 per the ROC Navy hydrographic notice; second target, an LCU, sank ~1847). NavSource independently records the 1 July 2020 sinking. The ROC MND press release confirms the 15 July 2020 live-fire exercise (SUT torpedo, Hsiung-series missiles) for which substitute targets were prepared.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 2020
- Population
- ROCN target-preparation and towing crews 2020
- Limitations
- Establishes the sinking date, method (as reported), and general location; press (not an official disposal record), Chinese-language primary reporting. No hazmat-preparation or decontamination documentation for the target sinking was located - relevant because a 1971-built steam hull may have retained ACM. Reported sinking coordinates (approx. 22.78N 121.64E per the hydrographic notice as quoted in press) are carried in current_location with this caveat.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-07
-
[9]Batch-4609 search ledger (this record): CourtListener API v4 opinion and RECAP docket searches for exact name and hull numbers - all queries completed under spaced retries; see search_ledger sl-04 through sl-09 and sl-15 through sl-23 [court_record]
- Locator
- search_ledger rows sl-uss-cook-ff1083-04 through sl-uss-cook-ff1083-09 and sl-uss-cook-ff1083-15 through sl-uss-cook-ff1083-23
- Finding type
- litigation_documented
- Finding
- LITIGATION SWEEP. Opinions: '"USS Cook"' exact-name = 0 hits; '"USS Cook" asbestos' = 0 hits; '"aboard the Cook"' = 0 hits; '"FF-1083"' = 0 hits; '"Cook (FF-1083)"' = 0 hits; '"Cook" "Foster Wheeler" mesothelioma' = 30 results, none naming this vessel (surname-collision set - 'Cook' collides heavily); '"DE-1083"' and '"DE 1083"' = 5 hits each, the same name-collision set (State of Wisconsin v. Ho-Chunk Nation 7th Cir. 2015; Aluminerie Becancourt v. U.S. CIT 2004; Zartic v. NLRB 11th Cir. 1987; U.S. v. Langella 2d Cir. 1985; Angier v. Commissioner BTA 1929 - numeric string matches, no ship or asbestos reference). Dockets ('"USS Cook"' RECAP search) = 2 hits, both resolved non-qualifying: (1) MDL-875 master docket 'In re Asbestos Products Liability Litigation (No. VI)' (JPML, docket 1245688) - the name match comes from tag-along notice Doc. 7778 attaching Dupre v. Eagle, Inc. et al., E.D. La. 2:11-cv-02097, whose removal papers allege Freddie Dupre was exposed while working on USS DURIK, USS WISEMAN, USS BURDO, and USS COOK at Todd Shipyards 'between 1944 and 1945' - i.e., USS Cook APD-130, the WWII hull, NOT this ship (laid down 1970); a name collision with the earlier hull, and a pleading-stage allegation at that; (2) Aviles v. BAE Systems Norfolk Ship Repair, E.D. Va. 2:13-cv-00418 - cause 42:2000 Job Discrimination (Sex), non-asbestos, non-qualifying. '"FF-1083"' RECAP docket search = 2 hits: (1) Siegfried v. 3M Company et al., C.D. Cal. 2:18-cv-01575 - QUALIFYING pleading-stage allegation naming this hull in the complaint's exposure schedule - see ev-09; (2) Ellipso, Inc. v. Draim, D.D.C. 1:06-cv-01373 - trademark action, 'FF-1083' is a model/string collision, non-qualifying. '"FF 1083"' opinions = 0 hits; '"Cook (FF-1083)"' dockets = 1 hit - the same Siegfried case (the parenthetical string matches only the Siegfried complaint); '"FF 1083"' dockets = 2 hits - the same Siegfried + Ellipso set as '"FF-1083"' (normalization confirmed at docket level); '"DE-1083"' dockets = 13 hits - 12 plainly non-vessel string collisions (criminal, bankruptcy, copyright, trademark, libel, insurance, 9/11-litigation dockets incl. Apple v. Corellium, Blatchford/Giuffre v. Maxwell, US v. Fallbrook PUD; 'DE-1083'/'DE 1083' inside those dockets resolves to document-entry and exhibit numbers) plus the MDL-875 master docket - and a scoped document-level query resolved the in-docket match: TWO additional qualifying pleading-stage complaints expressly naming 'COOK (DE-1083)' - Nash v. Huntington Ingalls (N.D. Cal. 3:11-cv-05356, tag-along Doc. 8040; Triple A Machine Shop shipfitter, ~11/1972-2/1973) and Dizon v. General Electric (N.D. Cal. 4:10-cv-05968, tag-along Doc. 6570; Subic Bay NRF take-home via father Alfonso Talorda, ~1970-77) - carried as ev-11 and ev-12. Name-collision note: Cook v. Foster Wheeler Energy Corp., No. 21-cv-11362 (D. Mass.), is a mesothelioma action by the widow of Navy boiler tender Ronald Cook whose 1966-68 service PREDATES this hull's 1971 commissioning - cannot be this ship.
- Verification
- verified
- Role
- negative_finding
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 2026-09-29
- Limitations
- Absence of a located public record does not prove absence of asbestos aboard - a 1970-71 steam plant is era-consistent with extensive ACM. CourtListener coverage is opinions + RECAP dockets, not all state/federal filings; unindexed complaints and settled MDL-875 claims would not appear. The Dupre 'USS COOK' reference is classified at pleading stage (complaint allegation, and of the WWII hull APD-130 in any case - not this ship); Aviles is classified by docket metadata only. The '"DE-1083"'-in-MDL-875 ambiguity was resolved by the scoped document-level query: the two in-docket hits are the Nash and Dizon tag-along complaints naming this hull (ev-11, ev-12). All sweep queries completed; no open leads remain from the planned search set.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-08
-
[10]Siegfried v. 3M Company et al., No. 2:18-cv-01575-FMO-E (C.D. Cal.), Notice of Removal Doc. 1-1 attaching Los Angeles Superior Court complaint BC691900, Exhibit A exposure schedule (RECAP gov.uscourts.cacd.702384.1.1) [court_record]
- Locator
- C.D. Cal. 2:18-cv-01575 docket (CourtListener docket 6320509); Doc. 1-1 complaint pp. 50-51, Exhibit A 'Location of Exposure' schedule; doc. 1-1 para. 22 (exposure allegation)
- Finding type
- litigation_documented
- Finding
- PLEADING-STAGE ALLEGATION naming this hull. The state-court complaint in Siegfried v. 3M (removed to C.D. Cal. 2:18-cv-01575 on 26 Feb 2018; terminated 7 Jan 2019) alleges plaintiff Terry Lee Siegfried developed malignant mesothelioma from asbestos exposure during his tenure as an electrician at Long Beach Naval Shipyard, approximately 1969-1996; the complaint's Exhibit A exposure schedule expressly lists 'Cook (Ff-1083)' among ~40 vessels at that yard (with Roark FF-1053, Gray FF-1054, Hepburn FF-1055, Meyerkord FF-1058, Lockwood FF-1064, Marvin Shields FF-1066, Francis Hammond FF-1067, Downes FF-1070, Barbey FF-1088, and others). The allegation is ship-specific to this hull (exact hull number) and temporally consistent - Cook had documented Long Beach NSY availabilities in 1972 and June 1979 - but it is a complaint allegation only, the lowest litigation stage; no discovery record, trial finding, or judgment on vessel-specific exposure was located. Cause of removal: 28:1441 asbestos litigation; nature of suit 368.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1969-1996 (alleged); 2018-2019 (litigation)
- Population
- Terry Lee Siegfried (LBNSY electrician ~1969-1996); LBNSY yard workers on Cook availabilities 1972 and 1979
- Limitations
- Complaint allegation, not a judicial finding - classified at pleading stage per batch discipline and never elevated. The vessel list is boilerplate plaintiff scheduling (40+ hulls); it alleges where exposure 'occurred' but names no Cook-specific product, date, or work event, and the case terminated ~10 months post-removal (disposition not examined - likely settlement or dismissal; no merits ruling on the Cook allegation was located). Does not independently establish asbestos aboard this hull.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-09
-
[11]Archival leads: NARA digitized deck logs (USS Cook DE-1083, 1972-1973 online); NARA microfiche deck logs 1979-1983; NHHC-held logs 1984+; BuShips/NAVSEA SCB 199C design specifications and per-vessel General Information Books; Triple A Shipyard 1977-79 and Continental Maritime 1988/1990 work packages; NAVSEA/DSCA FMS-SAP case file for the Taiwan transfer; ROC Navy reactivation/service records for Hai Yang (FF-936) [other_primary]
- Locator
- archives.gov 'Navy Deck Logs Available in the National Archives Catalog' index (Cook DE-1083: 1972, 1973); NARA deck-log holdings description (1979-83 microfiche; 1984+ at NHHC); NVR disposal record (custodian TAIWAN)
- Finding type
- historical_record
- Finding
- Hull-level records that could contain ship-specific materials or hazmat data: NARA's digitized deck-log index lists Cook (DE-1083) for 1972 and 1973 (online); deck logs 1979-1983 exist on microfiche at NARA and 1984+ logs are held by NHHC. BuShips SCB 199C specifications and per-vessel General Information Books (NARA RG 19) may carry per-hull material specifications. Work packages for the documented boiler-scope availabilities (Triple A 1977-79; Continental Maritime 1988 DSRA and 1990 PMA; Long Beach NSY 1972/1979; Subic Bay 1975 drydock) are the likeliest repositories of insulation work items. The NAVSEA/DSCA security-assistance case file for the 1994 lease/1999 sale would carry transfer condition; ROC Navy records would carry any reactivation/abatement scope and 2020 target-preparation hazmat documentation.
- Verification
- unverified
- Role
- archival_lead
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1971-2020
- Limitations
- Leads only - contents not examined; presence of asbestos-related entries in any of these records is unknown.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-10
-
[12]Nash v. Huntington Ingalls Inc. et al., No. 3:11-cv-05356-EMC (N.D. Cal.) - MDL-875 Notice of Potential Tag-Along Doc. 8040 (filed 11 Nov 2011) attaching the complaint; exposure schedule entry 'COOK (DE-1083)' (RECAP gov.uscourts.jpml.375294.8040.2) [court_record]
- Locator
- MDL-875 docket 1245688, Doc. 8040-2 complaint, exposure schedule pp. 23 (Triple A Machine Shop block, 'COOK (DE-1083)')
- Finding type
- litigation_documented
- Finding
- PLEADING-STAGE ALLEGATION naming this hull by its DE designation. The complaint in Nash v. Huntington Ingalls (N.D. Cal. 3:11-cv-05356; Brayton Purcell LLP; tagged into MDL-875 via JPML notice Doc. 8040; plaintiff of record Lela M. Nash) schedules shipfitter Phillip Nash's asbestos exposure employed by Triple A Machine Shop, Inc., Pier 64, San Francisco, aboard or alongside 'COOK (DE-1083)' together with Kawishiwi (AO-146), Kansas City (AOR-3), Mauna Kea (AE-22), Coral Sea (CVA-43), Fanning (DE-1076), Roark (DE-1053), and others - the listed exposure window reads approximately 11/1972-2/1973 (~3 months). Ship-specific to this hull (exact designation DE-1083); pleading-stage complaint allegation only.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1972-1973 (alleged); 2011 (litigation)
- Population
- Phillip Nash (injured worker; Triple A Machine Shop shipfitter, Pier 64 San Francisco); Lela M. Nash (plaintiff of record); Triple A yard workers
- Limitations
- Complaint allegation, not a judicial finding - classified at pleading stage per batch discipline. The schedule is a boilerplate plaintiff vessel list; no Cook-specific product, work event, or merits ruling was located. The stated ~Nov 1972-Feb 1973 window falls between this hull's post-shakedown availability end (Long Beach NSY, 10 Nov 1972) and first WestPac departure (9 May 1973) - the complaint does not place the work at a specific yard event, and Triple A's documented Cook work in DANFS is the 1977-79 overhaul, not 1972-73.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-11
-
[13]Dizon v. General Electric Co. et al., No. 4:10-cv-05968-PJH (N.D. Cal.) - MDL-875 Notice of Potential Tag-Along Doc. 6570 (filed 10 Jan 2011) attaching the complaint; exposure schedule entry 'COOK (DE-1083)' (RECAP gov.uscourts.jpml.375294.6570.2) [court_record]
- Locator
- MDL-875 docket 1245688, Doc. 6570-2 complaint, para-occupational exposure schedule (Naval Repair Facility Subic Bay block, 'COOK (DE-1083)')
- Finding type
- litigation_documented
- Finding
- PLEADING-STAGE ALLEGATION naming this hull by its DE designation, on a take-home (para-occupational) theory. The complaint in Dizon v. General Electric (N.D. Cal. 4:10-cv-05968-PJH; filed 30 Dec 2010; tagged into MDL-875 via JPML notice Doc. 6570) alleges decedent Nellia Dizon (lung cancer, died 4 Jan 2010) was exposed through her father Alfonso Talorda's work clothes: Talorda was an electrician at the Naval Repair Facility, Subic Bay, Philippines, 1957-1977, and the complaint's vessel schedule includes 'COOK (DE-1083)' among ~30 U.S. Navy ships (with Bagley DE-1069, Bradley DE-1041, Carpenter DD-825, Chicago CG-11, Coral Sea CV-43, Decatur DD-936, Duluth LPD-6, Essex CV-9, Hancock CV-19, Hector AR-7, and others); the listed window for the Cook row reads approximately 1970-1977. Ship-specific to this hull (exact designation DE-1083, and the 1970-77 window postdates APD-130's 1969 retirement); pleading-stage complaint allegation only, consistent with Cook's documented January 1975 Subic Bay drydocking.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1970-1977 (alleged); 2010-2011 (litigation)
- Population
- Nellia Dizon (decedent, take-home exposure); Alfonso Talorda (father, Subic Bay NRF electrician 1957-1977); Subic Bay yard workers on Cook's Jan 1975 drydock
- Limitations
- Complaint allegation, not a judicial finding - classified at pleading stage per batch discipline. Take-home exposure theory via the father's contaminated clothing; the schedule is a boilerplate vessel list (~30 hulls); no Cook-specific product, work event, date, or merits ruling was located. Row aligns with the hull's documented Jan 1975 Subic Bay drydock but the complaint asserts no specific work aboard her.
- Atlas source
- true
- Evidence ID
- ev-uss-cook-ff1083-12
Attribution
- Compiled by
- Paul Danziger; Rod de Llano
- Publisher
- Danziger & De Llano, LLP
- License
- CC-BY-4.0
- Citation
- Danziger, P., and De Llano, R. (2026). AsbestosAtlas Navy Vessel Asbestos Exposure Dataset. Danziger & De Llano, LLP. DOI: not yet assigned
- Dataset version
- asbestosatlas-ships-2026.10.12-rc.1
- DOI
- not yet assigned