USS George E. Davis (DE-357)

Name
USS George E. Davis
Hull designation
DE-357
Vessel class
John C. Butler
Evidence tier
Tier 2
Evidence entries
9
Record ID
uss-george-e-davis-de357
Dataset version
2026.10.12-rc.1
Canonical URL
https://asbestosatlas.org/ships/uss-george-e-davis-de357

Evidence

9 evidence entries recorded; each entry has a stable permalink (#ev-1 … #ev-9).

  1. [1]DANFS, George E. Davis (DE-357), Vol. 3 (1968) p.75, with bracketed Bauer & Roberts, Register of Ships of the U.S. Navy 1775-1990 disposition note (verbatim transcription - live NHHC page serves 404) [nhhc_danfs]
    Locator
    DANFS entry DE-357, specifications block + full service narrative
    Finding type
    vessel_history
    Finding
    DANFS record for this hull: laid down 15 February 1944 by Consolidated Steel Corp., Orange, Tex.; launched 8 April 1944 (sponsored by Mrs. George E. Davis, Jr., the namesake's widow); commissioned 11 August 1944, Lt. Comdr. Frederick L. Lincoln in command. Shakedown off Bermuda; departed Norfolk for the Pacific 21 October 1944; convoy escort Hollandia-San Pedro Bay, Leyte (arrived 12 December); Philippine Sea Frontier convoy escort and antisubmarine patrols out of San Pedro Bay; March-June 1945 patrols west of Mindoro and Luzon and Subic Bay-Ulithi-Leyte Gulf escort; July 1945 convoys between the Philippines and Okinawa; postwar occupation-troop escort Philippines-Japan, then China coast reoccupation support (Tsingtao; East China and Yellow Seas) until April 1946; arrived San Pedro, Calif. 11 May 1946; decommissioned San Diego 26 August 1946 (Pacific Reserve Fleet). Recommissioned San Diego 11 July 1951; to Newport, R.I. (arrived 27 October 1951) as Naval Reserve training ship, Atlantic Fleet, along the eastern seaboard and Caribbean until June 1954; decommissioned 11 November 1954 at Green Cove Springs, Fla. (Atlantic Reserve Fleet); berthed with the Atlantic Reserve Fleet at Orange, Tex. Stricken from the Navy Register 1 December 1972; sold 2 January 1974 (Bauer & Roberts p.236).
    Verification
    verified
    Role
    supporting
    Documentation level
    ship_specific
    Accessed
    2026-09-28
    Study period
    1944-1974
    Population
    Consolidated Steel construction trades (Orange, Tex., 1944); wartime crew; Naval Reserve training-ship crew and reserve trainees 1951-54 (design complement 222)
    Limitations
    DANFS documents builder, dates, and service narrative - it contains no materials or asbestos information. The live NHHC page for this hull returned 404 on 2026-09-28, so a verbatim transcription mirror is cited. A second transcription (ibiblio/HyperWar de357.html) garbles the namesake paragraph (Houston CA-30 rendered as Boston; Maryland BB-46 as BB-8) - the hazegray/losthistory transcription cited here is textually correct; the ship's own service narrative is identical in both.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-01
  2. [2]Bureau of Ships, Ships' Data, U.S. Naval Vessels, Vol. 1 (15 April 1945), NAVSHIPS 250-010 - DE register row 78 for this hull + DE design-group-6 (WGT) table (shipscribe.com scan, OCR) [other_primary]
    Locator
    SDB1945v1 register pp.242-243, DE row 78; design-group table pp.234-235 row 6 (WGT)
    Finding type
    vessel_history
    Finding
    Official BuShips register row 78 names this hull: 'DAVIS, GEORGE E. DE357', design group WGT; built by Consolidated Steel Corp., Orange, Tex.; contract price $2,043,000 (footnoted price-basis marker); contract signed 7 August 1942; keel laid 15 February 1944; launched 8 April 1944; contract completion date 30 May 1944; preliminary acceptance 11 August 1944; first commissioning 11 August 1944. The design-group-6 (WGT) table on pp.234-235 fixes the type plant: 306 ft oa, 1,350 t standard (1,745 t full load), 24.3 kt trial, accommodations 15 officers / 207 enlisted, 2 shafts, geared turbines 12,000 shp, 2 'D' express boilers 435 psi / 750 deg F; group note: 'Turbines were built by G.E. or Westgh. and are interchangeable as units' - DE-357's register row carries no turbine-maker footnote, so hull-level turbine manufacturer is unverified.
    Verification
    verified
    Role
    supporting
    Documentation level
    ship_specific
    Accessed
    2026-09-28
    Study period
    1942-1945
    Population
    Consolidated Steel Orange yard construction workforce, 1944
    Limitations
    Primary BuShips document; OCR transcription of a scanned table may contain digit-level errors (all dates cross-checked against DANFS and agree). Documents contract, construction, and design data - contains no materials or asbestos information. Contract 'completion date' of 30 May 1944 is the contract schedule, not actual delivery (commissioned 11 August 1944).
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-02
  3. [3]Shipbuilding History (T. Colton), Consolidated Steel Corp., Orange TX yard ledger, DE-357 row [other_primary]
    Locator
    Consolidated Orange yard table, hull DE-357 row
    Finding type
    historical_record
    Finding
    Builder-yard production ledger for this hull: Consolidated Steel Corp., Orange, Tex., contract dated 7 August 1942; keel laid 15 February 1944; launched 8 April 1944; delivered 11 August 1944; 53 days on the ways, 125 days in the water (fitting out), 178 days total; disposition 'scrapped 1974'. Consolidated's Orange yard was developed for the war effort adjacent to a pre-existing small shipyard (former Orange Car & Steel, successor to Southern Dry Dock & Shipbuilding); postwar the yard became a U.S. Steel division fabricator.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-28
    Study period
    1942-1974
    Population
    Consolidated Steel Orange yard construction workforce, 1942-1944
    Limitations
    Secondary compilation cross-checked against DANFS (all dates agree). Documents construction timeline and yard identity only - no materials, asbestos, or worker-exposure data. The scrapping buyer and scrapping site are not named in this source or in DANFS.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-03
  4. [4]Bureau of Ships, Ships' Data, U.S. Naval Vessels, Vol. 1 (15 Apr 1945), NAVSHIPS 250-010, design group 6 (WGT) row + Navypedia John C. Butler (WGT) class boiler-block map [other_primary]
    Locator
    SDB1945v1 pp. 234-235 design-group table row 6; navypedia us_de_tev_wgt.htm block map
    Finding type
    asbestos_application
    Finding
    Era/design inference: DE-357 is a John C. Butler-class (BuShips design group 6, 'WGT') destroyer escort built Feb-Aug 1944 with a full superheated-steam plant - 2 'D' express boilers at 435 psi/750 deg F, 2-shaft geared turbines, 12,000 shp, 24.3 kt. Per the Navypedia WGT boiler-block map, DE-339 through DE-372 (the block containing DE-357) carried Combustion Engineering boilers; per the BuShips group-6 note, turbines 'were built by G.E. or Westgh. and are interchangeable as units' (this hull's register row carries no maker footnote - hull-level maker unverified). A steam plant of this specification and construction era was built with period-standard asbestos insulation, steam-line lagging, gaskets, packing, and fireproofing; destroyer-escort litigation materials (ev-05) identify the controlling era insulation specs as asbestos-era documents.
    Verification
    inferred
    Role
    supporting
    Documentation level
    class_or_era
    Accessed
    2026-09-28
    Study period
    1944-1954
    Population
    Construction trades, Consolidated Steel Orange (Feb-Aug 1944); crews 1944-46, 1951-54
    Limitations
    Class/era inference only - no ship-specific record confirms asbestos products aboard this hull, their quantities, or any individual exposure. Boiler-vendor attribution (Combustion Engineering) is per the Navypedia block map, unverified against contract documents. This row adds era context; it is not a ship-specific finding.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-04
  5. [5]Jack v. Borg-Warner Morse Tec LLC, W.D. Wash. No. 2:17-cv-00537 - expert-witness exhibit list, ECF 738 att. 1 (classmate-hull litigation; document identifications) [court_record]
    Locator
    Jack v. Borg-Warner ECF 738 att. 1, exhibit items Honeywell-160 through -167
    Finding type
    historical_record
    Finding
    In the only located litigation involving a John C. Butler-class hull (USS Charles E. Brannon, DE-446, Federal Shipbuilding-built), the expert-witness exhibit list identifies the primary Navy insulation-document suite relied on in DE-era asbestos litigation: 'Bureau of Ships Manual, Chapter 39, Thermal Insulation, NAVSHIPS 250000(39), dated 24 August 1945'; 'Navy Department Specification, Felt, Insulating, Asbestos, 32F3a, dated 15 October 1945'; 'General Specifications for Machinery - Subsection S39-1, Bureau of Engineering, 3 Feb 1939'; 'Instructions Relative to Heat Insulation' (BuEng Manual ch.13, rev. 1933, repr. May 1939); BUMED Code-55 memo 'Occupational Health Issues for POM-80' (9 June 1977). These era-wide specs would govern insulation installed aboard DE-357 as built.
    Verification
    verified
    Role
    archival_lead
    Documentation level
    context_only
    Accessed
    2026-09-28
    Study period
    1933-1977 (documents); 2017-2019 (litigation)
    Population
    n/a
    Limitations
    Archival lead only: exhibit-list identifications, not retrieved documents, from litigation about a different hull (DE-446). No ship-specific application of these specs to DE-357 is documented; the Jack materials themselves concede non-asbestos insulation was possible aboard that DE. Establishes the research target, not exposure aboard this hull.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-05
  6. [6]GAO, Navy Efforts To Protect Workers From Asbestos Exposure, HRD-80-2 (Oct 18, 1979) [gao]
    Locator
    GAO product page HRD-80-2 (full text blocked to automated fetch, HTTP 403; content via product-page description)
    Finding type
    gov_survey
    Finding
    GAO documented the Navy's asbestos-protection program posture: standing policy from 1975 removed asbestos insulation only when damaged or required for repairs, modified 1979 to selective replacement in high-maintenance areas - meaning original-era insulation typically remained in place for decades absent yard disturbance. Context for this hull's timeline: DE-357's last commissioned period ended November 1954 and she was stricken 1972, sold for scrapping January 1974 - the hull left Navy custody before the GAO-described program-era reviews.
    Verification
    verified
    Role
    context
    Documentation level
    context_only
    Accessed
    2026-09-28
    Study period
    1979
    Population
    Navy shipyard workers (program review population, not this hull)
    Limitations
    Program-level documentation, not ship- or class-specific; fieldwork yards were elsewhere. DE-357 was scrapped before the period GAO surveyed, so this row frames why no modern Navy survey or abatement record for the hull should be expected.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-06
  7. [7]Batch-4261 search ledger (this record): DANFS transcription mirrors; shipbuildinghistory yard ledger; NavSource photo archive; CourtListener API v4 opinion and RECAP docket sweeps; Atlas shipyard dataset [other_primary]
    Locator
    search_ledger rows sl-uss-george-e-davis-de357-01 through -11
    Finding type
    historical_record
    Finding
    No qualifying ship-specific asbestos record located: no hull ACM survey, no abatement contract or disposal hazmat disclosure, and no docketed asbestos litigation naming USS George E. Davis or DE-357 was found in the public sources searched (see search_ledger). CourtListener opinion sweeps for the ship name and hull number returned only unrelated hits (reporter-page and name collisions). The only asbestos-bearing pages naming the hull are law-firm marketing pages (shepardlawfirm.com, freeasbestostesting.com, mesotheliomabook.com), which are excluded sources under batch rules and assert no documentable ship-specific fact.
    Verification
    verified
    Role
    negative_finding
    Documentation level
    ship_specific
    Accessed
    2026-09-28
    Study period
    2026-09-28
    Limitations
    Absence of a located public record does not prove absence of asbestos aboard - the hull's 1944 construction with a superheated-steam plant is consistent with retained era materials through scrapping, and no scrapping-environmental record was located. Does not establish or defeat any claim of exposure or legal eligibility.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-07
  8. [8]CourtListener API v4 litigation sweep for USS George E. Davis / DE-357 (authenticated, 2026-09-28) [court_record]
    Locator
    CourtListener API v4 type=o and type=r queries; search_ledger rows 04-06
    Finding type
    litigation_documented
    Finding
    CourtListener sweeps located no qualifying asbestos litigation naming this hull: opinion search 'USS George E. Davis' returned 57 loosely-matched results (first 20 reviewed - all unrelated name/text collisions, no vessel reference); opinion search '"DE-357"' returned 12 results (all reviewed - reporter-pagination and 'DE'-identifier collisions, no vessel reference); RECAP docket search '"George E. Davis"' returned 58 hits (first 20 reviewed - every one a personal bankruptcy docket for individuals named George E. Davis, i.e. name collisions, none a vessel or asbestos case). No complaint, opinion, or docket naming the hull was located.
    Verification
    verified
    Role
    negative_finding
    Documentation level
    ship_specific
    Accessed
    2026-09-28
    Study period
    2026-09-28
    Population
    n/a
    Limitations
    Negative sweep covers CourtListener's indexed corpus only - unindexed state-court pleadings, settled asbestos trust claims, and non-digitized filings are outside its scope. A no-hit sweep does not prove no plaintiff ever alleged exposure aboard this hull.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-08
  9. [9]NARA Record Group 24 (deck logs) and RG 19 (BuShips General Information Books) holdings for DE-357 - not retrieved [other_primary]
    Locator
    NARA RG 24 deck-log series; RG 19 General Information Books
    Finding type
    historical_record
    Finding
    Untapped primary repositories for this hull: NARA deck logs (RG 24) covering the 1944-46 commissioned period and the 1951-54 Naval Reserve training period; BuShips General Information Books (RG 19) which, where extant for DEs, carry per-vessel material specifications; and the Consolidated Steel Orange yard contract file (contract dated 7 August 1942). None retrieved this session.
    Verification
    unverified
    Role
    archival_lead
    Documentation level
    context_only
    Accessed
    2026-09-28
    Study period
    1944-1954 (records)
    Population
    n/a
    Limitations
    Lead only - presence of a usable DE-357 entry in these holdings is unverified. GIB coverage of Consolidated-built DEs is incomplete.
    Atlas source
    true
    Evidence ID
    ev-uss-george-e-davis-de357-09

Attribution

Compiled by
Paul Danziger; Rod de Llano
Publisher
Danziger & De Llano, LLP
License
CC-BY-4.0
Citation
Danziger, P., and De Llano, R. (2026). AsbestosAtlas Navy Vessel Asbestos Exposure Dataset. Danziger & De Llano, LLP. DOI: not yet assigned
Dataset version
asbestosatlas-ships-2026.10.12-rc.1
DOI
not yet assigned