11 evidence entries recorded; each entry has a stable permalink (#ev-1 … #ev-11).
-
[1]research packet 371-packet.md (2 sources cited) [other_primary]
- Finding type
- vessel_history
- Finding
- Identity packet verdict: VERIFIED
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Evidence ID
- uss-ix-310-ix310-pkt-371-packet-md
-
[2]Naval Vessel Register (NAVSEA), Ship Details — NO NAME (IX 310), shipId 2375; NVR service-craft hull list (getHullListData, shipCraft=2) [other_primary]
- Locator
- NVR ship detail page shipId=2375 (Status, Milestone Dates, Program Characteristics blocks); NVR service-craft list row 'IX 310'
- Finding type
- vessel_history
- Finding
- Naval Vessel Register detail record for IX 310: name 'NO NAME' (ex-FLOATING EQUIPMENT), class IX 310 'UNCLASSIFIED MISCELLANEOUS', UIC 22271, status 'active, in service', status-change date 04/01/1971, builder Wiley Manufacturing Co., delivery date 06/01/1969, custodian 'NAVAL UNDERSEA WARFARE CENTER DIV., DET. SENECA LAKE, DRESDEN, NY', planning yard Puget Sound Naval Shipyard & IMF, ships program manager PMS 300; record last updated 03/12/2025. NVR service-craft index lists IX 310 statusDesc ACTIVE among IX-category craft.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1969-2025
- Limitations
- Official register record; establishes identity, builder, delivery, designation date, custodian, and current status. Contains no asbestos, materials, or survey information. Physical-characteristics block withheld by NVR public-information policy. Does not itself equate the craft with the 'Systems Measurement Platform' name used by NAVSEA — that identification rests on NavSource and the Colton shipbuilding list.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-01
-
[3]NAVSEA, NUWC Division Newport — Seneca Lake Sonar Test Facility pages: 'Systems Measurement Platform', 'Facility Power/Heavy Lift Capability', 'Remote Calibration Platform/Test Barge Support' (navsea.navy.mil) [other_primary]
- Locator
- Systems Measurement Platform page; Facility Power page (heavy lift + power sections); facility overview page
- Finding type
- vessel_history
- Finding
- NAVSEA/NUWC Division Newport official Seneca Lake Sonar Test Facility pages describe the Systems Measurement Platform (SMP): catamaran-type configuration 192 ft x 120 ft, drafting ~3 ft; two 75x35-ft pontoons joined by an overhead center span housing offices, workspaces, two 42x22-ft laboratories, storage, and a galley; two 75x50-ft test wells; 200-ton derrick crane built into the superstructure; permanently moored near the center of Seneca Lake ~2.6 km off the western shore in ~460 ft of water; powered from the shore substation by underwater cable (2.2 MW at ~13 kVac, aboard power 480/208/120 Vac, DC to 5 kVdc); two equipment-handling barges and transport boats serve the facility.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- current (page content as accessed 2026-09-29)
- Population
- NUWC facility staff and contractor test teams (day-access)
- Limitations
- The NAVSEA pages use the 'Systems Measurement Platform' name and never print the 'IX-310' designation — identification of the SMP as IX-310 rests on NavSource (which captions the craft 'Systems Measuring Barge IX-310') and the Colton shipbuilding list ('IX 310 ... Systems Measurement Platform'), corroborated by the NVR custodian field placing IX-310 at this facility. No asbestos or materials content stated.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-02
-
[4]NavSource Naval History, Service Ship Photo Archive — IX-310 (navsource.net/archives/09/46/46310.htm) [other_primary]
- Locator
- IX-310 archive page: service history block, specifications block, December 2016 photograph captions by David Wright
- Finding type
- vessel_history
- Finding
- NavSource Service Ship Photo Archive entry for IX-310: laid down at Wiley Manufacturing Company as a derrick barge (date unknown); 'placed in service as Unclassified Miscellaneous Systems Measuring Barge (Sonar Testing Barge) IX-310 in April 1971'; 'active, in service, assigned to Naval Underwater Warfare Center Seneca Lake, Dresden, N.Y.'; specifications 1,070 t (light) / 1,438 t (full load), 195 ft length, 123 ft beam, 5 ft max draft, complement none, armament none, propulsion none; photographs of the platform in Seneca Lake dated December 25-28, 2016; page states 'There is no DANFS History for IX-310'.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1969-2017 (page last updated 2017-01-20)
- Limitations
- Compiled secondary archive, not an official record — but the standard photographic/spec reference for unnamed service craft, and the source that prints the 'IX-310 = Systems Measuring Barge' identification. Its 'acquired by the US Navy in June 1971' conflicts with the NVR delivery date of June 1969 (likely conflating the April 1971 designation); NVR adopted. No asbestos information.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-03
-
[5]Tim Colton, ShipbuildingHistory.com — Wiley Manufacturing, Port Deposit MD yard hull list (shipbuildinghistory.com/shipyards/small/wiley.htm) [other_primary]
- Locator
- Wiley yard table, hull 730 row ('IX 310 | US Navy | Derrick Barge | 1,070 | 195 | 1969 | Systems Measurement Platform')
- Finding type
- vessel_history
- Finding
- Colton's shipbuildinghistory.com hull list for Wiley Manufacturing, Port Deposit MD: yard hull 730 — 'IX 310', owner US Navy, type Derrick Barge, 1,070 GT, 195 ft, delivered 1969, disposition 'Systems Measurement Platform'. Companion yard history: Wiley Manufacturing Company (founded 1939 as Wiley Equipment Company, renamed 1943), Port Deposit MD on the Susquehanna River; yard closed 1987.
- Verification
- verified
- Role
- supporting
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 1969 (construction); list compiled to 2020
- Population
- Wiley Manufacturing construction workforce (Port Deposit, 1969)
- Limitations
- Industry reference compilation, not an official record; independently corroborates NVR (builder, 1969 delivery, 1,070-ton derrick barge) and supplies the yard hull number and the explicit 'IX 310 = Systems Measurement Platform' linkage. No asbestos or materials information.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-04
-
[6]U.S. General Accounting Office, 'Navy Efforts To Protect Workers From Asbestos Exposure,' HRD-80-2, published 1979-10-18 (product page + indexed full text) [gao]
- Locator
- GAO product page Highlights + full-report text (gao.gov/assets/hrd-80-2.pdf); PDF blocked to automated fetch (HTTP 403) — passages verified via indexed search text
- Finding type
- regulatory
- Finding
- GAO HRD-80-2 (October 1979) documents Navy asbestos policy timing: product specifications for thermal insulation were changed in 1973 to specify asbestos-free materials; the Navy's policy to eliminate asbestos where suitable alternates existed issued October 1975; and because pre-purchased asbestos stock was already installed in ships under construction, 'some ships were delivered with asbestos insulation as late as May 1978.' A craft delivered in June 1969 predates all of these controls — era-consistent with asbestos-containing outfit materials, though as a non-powered barge the steam-plant thermal-insulation pathway the report addresses does not exist on this hull.
- Verification
- verified
- Role
- context
- Documentation level
- class_or_era
- Accessed
- 2026-09-29
- Study period
- 1973-1979 policy period documented; report 1979
- Population
- Navy shipbuilding/repair workforce (program context)
- Limitations
- Program-level documentation of Navy asbestos policy timing — does not name this hull or any craft; fieldwork yards were Long Beach and Norfolk naval shipyards. Establishes only that 1969 construction predated asbestos-elimination controls; a derrick barge's outfit (offices, labs, galley superstructure, crane machinery) is not the shipboard thermal-insulation subject of the report. Does not establish asbestos aboard this hull.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-05
-
[7]Geneva Public Library Digital Collection via New York Heritage Digital Collections — item JSY/113, 'Submarine Testing Seneca Lake' [museum_official]
- Locator
- Item JSY/113 description field
- Finding type
- vessel_history
- Finding
- Geneva Public Library digital collection (NY Heritage) photograph 'Submarine Testing Seneca Lake': documents 'preparations for a measurements and testing of the US Navy's largest submarine bow sonar arrays' and states 'the test and evaluation of the Seawolf bow fixture were performed at the NUWC systems measurement platform, which is a floating measurements laboratory stationed approximately at the middle of Seneca Lake.'
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- undated photograph; Seawolf bow fixture era (1990s)
- Population
- NUWC test personnel (era of Seawolf bow fixture testing)
- Limitations
- Documents the platform's mission and a named test program (Seawolf bow fixture, mid-1990s era) at the systems measurement platform — the platform is IX-310 by the NavSource/Colton linkage; the archive item does not print the hull designation. Contains no asbestos, materials, or worker-safety information.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-06
-
[8]DVIDS / Naval Undersea Warfare Center Division Newport release, 'NUWC Division Newport test range capabilities highlighted during virtual open house' (2021-03) [other_primary]
- Locator
- Article, 'Seneca Lake Sonar Test Facility' section
- Finding type
- vessel_history
- Finding
- Official Navy release (DVIDS) on NUWC Division Newport's March 11, 2021 open house: 'Seneca Lake is home to the Systems Measurement Platform, a stable moored platform with two test wells,' with heavy-lift capability, boat fleet, and high-voltage supply — confirming the platform remained in service at the Seneca Lake Sonar Test Facility, Dresden NY, as of 2021.
- Verification
- verified
- Role
- context
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 2021
- Limitations
- Official DoD release confirming continued operation of the platform at Seneca Lake; does not print the IX-310 hull designation and contains no asbestos information.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-07
-
[9]CourtListener API v4 via fleet authenticated helper (cl-auth-search.py) — opinion and docket (RECAP) indexes [court_record]
- Locator
- search_ledger rows sl-uss-ix-310-06 and sl-uss-ix-310-07
- Finding type
- litigation_documented
- Finding
- CourtListener litigation sweep for this hull: searches run on exact designation strings ('IX-310', 'IX 310') across the opinion index and 'IX-310'/'Systems Measurement Platform'/'Seneca Lake sonar' across the docket index. Result: PENDING — fleet-wide CourtListener pacing blocked all authenticated requests during the session; sweep could not be completed. Residual risk of a qualifying hit is low: the craft is unnamed (case-name search has no vessel name to match) and uncrewed.
- Verification
- unverified
- Role
- negative_finding
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 2026-09-29
- Limitations
- Sweep BLOCKED, not negative: the helper returned fleet-pacing stand-down on every attempt; no CourtListener result was actually obtained. Recorded as a gap, not a cleared litigation surface. Any asbestos-litigation hit would in any case be an allegation-stage record requiring stage classification.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-08
-
[10]Batch-4801 search ledger (this record): NVR detail + service-craft list; NAVSEA Seneca Lake detachment pages; NavSource IX-310; ShipbuildingHistory Wiley list; NHHC/DANFS check; firecrawl search for asbestos/abatement/hazmat + IX-310/SMP; NY Heritage/Geneva Public Library; DVIDS; GAO HRD-80-2 [other_primary]
- Locator
- search_ledger rows sl-uss-ix-310-01 through sl-uss-ix-310-09
- Finding type
- historical_record
- Finding
- No qualifying ship-specific asbestos record located: no asbestos survey, abatement contract, hazmat disclosure, environmental report, or DANFS entry names this craft in the public sources searched; the only web presence tying 'IX-310' to asbestos is its appearance on asbestos-marketing ship lists (e.g., freeasbestostesting.com), which are non-qualifying sources not carried as evidence (see search_ledger).
- Verification
- verified
- Role
- negative_finding
- Documentation level
- ship_specific
- Accessed
- 2026-09-29
- Study period
- 2026-09-29
- Limitations
- Absence of a located public record does not prove absence of asbestos aboard — a 1969-built craft predates the Navy's asbestos-elimination controls and its superstructure outfit materials are undocumented. Does not establish presence or absence; does not establish or defeat any exposure claim or legal eligibility.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-09
-
[11]NARA research guide 'Researching Asbestos aboard US Naval Vessel up through 1961' (archives.gov) — RG 19 correspondence entries; NVR custodian record [other_primary]
- Locator
- NARA guide (scope statement + RG 19 entry list); NVR program characteristics block
- Finding type
- historical_record
- Finding
- Archival lead (not retrieved — no spend authorized): NARA's guided topic 'Researching Asbestos aboard US Naval Vessel up through 1961' maps the RG 19 Bureau of Ships correspondence path, but its coverage ends in 1961 — before this 1969-built craft existed. Construction/outfit records for Wiley hull 730 (1969) would sit in post-BuShips NAVSEA and Naval Ship Engineering Center series and NUWC Division Newport/Detachment Seneca Lake records; NVR historical data (custodian, designation chain) confirms the administrative trail exists. None surveyed.
- Verification
- unverified
- Role
- archival_lead
- Documentation level
- context_only
- Accessed
- 2026-09-29
- Study period
- 1969-present records
- Limitations
- Record-group mapping only, and the guide's RG 19 coverage stops at 1961 — eight years before this hull's delivery; existence of asbestos-specific documents for Wiley hull 730 is unknown until later NAVSEA/NUWC series are surveyed in person. Nothing in this row is an asbestos finding.
- Atlas source
- true
- Evidence ID
- ev-uss-ix-310-10