USS LCS(L)(3)-103

Name
USS LCS(L)(3)-103
Hull designation
LCS(L)(3)-103
Vessel class
LCS(L)(3)
Evidence tier
Tier 2
Evidence entries
9
Record ID
uss-lcs-l-3-103-lcsl3103
Dataset version
2026.10.12-rc.1
Canonical URL
https://asbestosatlas.org/ships/uss-lcs-l-3-103-lcsl3103

Evidence

9 evidence entries recorded; each entry has a stable permalink (#ev-1 … #ev-9).

  1. [1]research packet 492-packet.md (1 sources cited) [other_primary]
    Finding type
    vessel_history
    Finding
    Identity packet verdict: VERIFIED
    Verification
    verified
    Role
    supporting
    Documentation level
    ship_specific
    Evidence ID
    uss-lcs-l-3-103-lcsl3103-pkt-492-packet-md
  2. [2]NavSource Online: Amphibious Photo Archive, USS LSSL-103 ex USS LCS(L)(3)-103 (10/05/050103) - construction, theater assignment, medal/service timeline, JMSDF transfer, specifications block sourced to Ships' Data U.S. Naval Vessels Navships 250-012 (15 April 1945), Baker's Allied Landing Craft of World War II, and Lawley class instructions/plans [other_primary]
    Locator
    NavSource 10/05/050103.htm header block, theater-assignment block, medal table, specification block, photo caption table, commanding-officer table
    Finding type
    vessel_history
    Finding
    Documented for this hull: laid down 13 January 1945 at Commercial Iron Works, Portland, OR; launched 3 February 1945; commissioned USS LCS(L)(3)-103 on 24 February 1945 (LT. R. K. Crawford, USNR, in command - the only CO listed). WWII assignment: Asiatic-Pacific Theater, LCS(L)(3) Flotilla Four (CDR. N. Phillips, USN), LCS(L)(3) Group Fourteen (LCDR. K. E. Curley, USN), LCS(L)(3) Division Twenty-Eight. Ribbons: China Service Medal (extended), American Campaign Medal, Asiatic-Pacific Campaign Medal, WWII Victory Medal, Navy Occupation Service Medal with Asia clasp. Postwar occupation/China service: Navy Occupation Service 19 September-4 December 1945 and 10-15 April 1946; China Service (extended) 5 December 1945-15 April 1946. Decommissioned, date unknown; laid up Pacific Reserve Fleet; redesignated LSSL-103, 28 February 1949; transferred on loan to Japan 30 September 1953, named Yaguruma; returned to US Navy custody 30 September 1958; struck, date unknown; fate unknown. Photo caption places her in port - possibly Whangpoo River, Shanghai, circa December 1945-April 1946 - with LCS(L)(3)-97, -102, and -104. Specifications: 250 t light / 387 t full; 158' o.a.; beam 23' 8"; 16.5 kts max; armor 10-lb STS splinter shield to gun mounts, pilot house, conning tower; complement 6 officers + 65 enlisted; endurance 5,500 miles at 12 kts; armament bow gun, one twin 40mm, two twin 40mm AA, four single 20mm AA, four .50 cal MG, ten MK7 rocket launchers; propulsion 2 quad packs of 4 General Motors '6051 series 71' diesels per shaft, 1,600 BHP, twin variable-pitch propellers, two diesel-drive 60 kW 450V AC ship's-service generators.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-30
    Study period
    1945-1958
    Population
    Commercial Iron Works construction trades (Jan-Feb 1945); crew 6 officers + 65 enlisted (1945-58 US custody periods)
    Limitations
    NavSource is a volunteer secondary compilation - milestone dates generally track the Naval Vessel Register/DANFS but are not the primary registry; decommissioning and striking dates are unrecorded here. Ship-specific history only; contains no asbestos or material content. Commissioning-date conflict with uboat.net (28 February 1945) carried in gaps.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-01
  3. [3]NavSource Online: Landing Craft Support (Large)(Mark 3) LCS(L)(3) / Landing Ship Support Large (LSSL) class index [other_primary]
    Locator
    NavSource 10/05/05idx.htm class description paragraph
    Finding type
    vessel_history
    Finding
    Class-level documentation for the type: 'One hundred thirty LCS(L)(3)s were built during World War II. They were developed by the George Lawley Company, Neponset, Mass and produced there and by Albina Engine and Machine Works, and Comercial Iron Works, Portland Oregon. LCS(L)(3)s served only in the Pacific campaign. In 1949 LCS(L)(3)s remaining in the US Navy's inventory were redesignated Landing Ship Support Large (LSSL). Fifty-three LSSLs were transferred to the Japan Maritime Self-defense Force in 1952 and numerous others were transferred to allied nations.'
    Verification
    verified
    Role
    context
    Documentation level
    class_or_era
    Accessed
    2026-09-30
    Study period
    1944-1958
    Population
    LCS(L)(3) crews and construction workforces across the three builder yards (1944-45); JMSDF crews of transferred hulls (1952/53-late 1950s)
    Limitations
    Class index, not a hull record - establishes that this hull is one of 130 wartime-built LCS(L)(3)s and corroborates builder and JMSDF-transfer pattern. The '1952' JMSDF transfer year conflicts with the hull page's 30 September 1953 date (transfers ran 1952-53; navypedia dates this hull's transfer September 1953). No asbestos content.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-02
  4. [4]uboat.net Allied Warships of WWII, USS LCS(L)-103 (LCS(L)-103) ship page [other_primary]
    Locator
    uboat.net ship/22335.html data table (Ordered, Laid down, Launched, Commissioned, History rows)
    Finding type
    historical_record
    Finding
    DATE CONFLICT: uboat.net's ship page for this hull gives 'Commissioned 28 Feb 1945' - four days later than the NavSource-documented 24 February 1945. uboat.net corroborates the other milestones: built by Commercial Iron Works, Portland, Oregon; ordered 23 June 1944; laid down 13 January 1945; launched 3 February 1945; transferred to Japan 30 September 1953; returned to the USN 30 September 1958. NavSource's 24 February 1945 date is carried throughout this record (consistent with NavSource's commanding-officer table entry for LT. Crawford); the uboat.net variant is noted, not adopted. The 23 June 1944 order date is a uboat.net-only detail - carried in gaps as unverified.
    Verification
    verified
    Role
    correction
    Documentation level
    ship_specific
    Accessed
    2026-09-30
    Study period
    1944-1958
    Limitations
    Secondary cross-check source; neither uboat.net nor NavSource is the primary registry, and the four-day commissioning conflict is unresolved. No asbestos content.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-03
  5. [5]HyperWar 'Ships of the U.S. Navy, 1940-45' stub page for USS LCS(L)-103 (generic LCS(L) class spec block, builder field blank) [other_primary]
    Locator
    HyperWar LCSL-103.html spec block
    Finding type
    historical_record
    Finding
    CORRECTION: the HyperWar stub page for this hull carries a generic spec block reading 'Built at __________, and commissioned 1944' - a placeholder that conflicts with the documented record. This hull was laid down 13 January 1945 and commissioned 24 February 1945 (NavSource); a 1944 commissioning is impossible for a hull not yet laid down. The stub's complement (5 officers, 68 enlisted), dimensions (158'5" length, 23'3" beam, 383 t full load), and propulsion ('2 G.M. diesel engines, model 6051, 1800 hp') also differ from the NavSource ship-specific figures (6 + 65; 158' / 23'8" / 387 t; quad-pack GM diesels, 1,600 BHP). NavSource figures carried throughout this record.
    Verification
    verified
    Role
    correction
    Documentation level
    ship_specific
    Accessed
    2026-09-30
    Study period
    1945
    Limitations
    Corrects a generic-stub date/spec conflict, not a material claim. HyperWar's 'model 6051' diesel notation matches the NavSource spec block's '6051 series 71' phrasing - consistent class literature; no conflict on engine type. No asbestos content.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-04
  6. [6]navypedia.org, 'YURI large amphibious fire support ships (1944-1945 / 1953)' - JMSDF transfer table for ex-LSSL hulls [other_primary]
    Locator
    navypedia jap_ls_ajisai.htm table row for Yaguruma (ex-LSSL103)
    Finding type
    vessel_history
    Finding
    Secondary JMSDF transfer table corroborates this hull's post-US career: 'Yaguruma (ex-LSSL103, ex-LCS(L)(3)103), LSSL450, Commercial Iron Works, Portland, USA, laid down 1.1945, launched 3.2.1945, commissioned 2.1945, transferred 9.1953, returned 9.1958' - consistent with NavSource's 30 September 1953 transfer-on-loan and 30 September 1958 return, and supplies the JMSDF pennant LSSL-450 not shown on the NavSource page.
    Verification
    verified
    Role
    context
    Documentation level
    ship_specific
    Accessed
    2026-09-30
    Study period
    1953-1958
    Population
    JMSDF crew of Yaguruma/LSSL-450 (1953-58)
    Limitations
    navypedia is a secondary compilation; pennant LSSL-450 and the month-level dates are used to corroborate, not extend, the NavSource record. JMSDF service details (bases, employment, disposal route) undocumented. No asbestos content.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-05
  7. [7]Board of Veterans' Appeals, Citation Nr. 9828426, Docket 94-15 783 (Sept. 23, 1998) - M21-1-era adjudication guidance recital on WWII ship construction asbestos [court_record]
    Locator
    BVA Citation 9828426, Analysis section (M21-1 recital paragraphs)
    Finding type
    regulatory
    Finding
    A VA appellate decision recites the era's federal adjudication guidance: 'during World War II, several million people employed in U.S. shipyards and U.S. Navy veterans were exposed to chrysotile products, as well as amosite and crocidolite, since these varieties of African asbestos were used extensively in military ship construction,' and 'the manual informs that asbestos was used extensively in military ship construction, and that millions of U.S. Navy veterans were exposed.' This recital documents the federal adjudication baseline for WWII-era Navy hulls - the era within which this hull was built (January-February 1945) and crewed.
    Verification
    verified
    Role
    context
    Documentation level
    class_or_era
    Accessed
    2026-09-30
    Study period
    1998 (decision); era guidance on WWII construction
    Population
    WWII US shipyard workers and Navy veterans (era baseline)
    Limitations
    Era-guidance carrier only: the underlying decision concerned a Consolidated Steel (Orange, TX) yard worker and different vessels - it names neither this hull nor its builder. The M21-1 recital is general-era documentation, not evidence of materials aboard this hull. Merits ruling for that claimant only; provides no finding about LCS(L)(3)-103.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-06
  8. [8]Era inference built on: NavSource specifications for this hull (quad-pack GM diesel plant, 1,600 BHP - no steam plant); NavSource LCS(L)(3) class index (130 hulls, three builders, Pacific-only); VA M21-1-era guidance as quoted in BVA 9828426 (asbestos products used extensively in WWII military ship construction) [other_primary]
    Locator
    NavSource 10/05/050103.htm specifications block; NavSource 10/05/05idx.htm class paragraph; BVA 9828426 M21-1 recital
    Finding type
    asbestos_application
    Finding
    A diesel-powered landing craft built January-February 1945 sits inside the Navy's documented asbestos-use era; era-standard applications aboard a vessel of this type and period were thermal insulation around the diesel engines and exhaust runs, gaskets, valve packing, and electrical insulation in a compact 158-foot hull shared with berthing for 6 officers and 65 enlisted. As a diesel craft she carried no steam plant - the boiler/turbine lagging pathway of steam vessels does not apply.
    Verification
    inferred
    Role
    supporting
    Documentation level
    class_or_era
    Accessed
    2026-09-30
    Study period
    1945-1958
    Population
    Commercial Iron Works construction/fitting-out trades (Jan-Feb 1945); crew (1945-decommissioning); Pacific Reserve Fleet maintenance crews; JMSDF crew (1953-58); post-strike disposal workforce (unknown - fate unrecorded)
    Limitations
    Class/era inference only - no hull-specific insulation schedule, material list, work package, or survey located for LCS(L)(3)-103 / LSSL-103 / Yaguruma. Names era-standard applications, not confirmed installed materials; no quantity; no manufacturer attribution. The 10-lb STS splinter shield noted in specifications is armor; its composition is undocumented here and no asbestos claim is made for it.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-07
  9. [9]Batch-5652 search ledger (this record): NavSource hull page and class index; uboat.net; navypedia; HyperWar stub; NHHC/DANFS (no entry); NVR (no entry - pre-1987 disposal); VA BVA decisions via secondary search (no LCS(L)/LSSL hull named); CourtListener opinion search (partially executed); NARA catalog (JS-rendered, unfetchable); GAO HRD-80-2 (blocked); secondary web litigation sweep [other_primary]
    Locator
    search_ledger rows sl-uss-lcs-l-3-103-lcsl3103-01 through -14
    Finding type
    historical_record
    Finding
    No qualifying ship-specific asbestos record located: no asbestos survey, insulation schedule, abatement contract, hazmat disclosure, or verified litigation naming USS LCS(L)(3)-103 / LSSL-103 / JMSDF Yaguruma was found in the public sources searched. CourtListener exact-phrase opinion queries returned zero results for all seven designation variants: 'LCS(L)(3)-103', 'LCS(L)-103', 'LCS-103', 'LCSL-103', 'LCS (L) (3)-103', 'LSSL-103', 'Yaguruma'. All RECAP docket (type=r) queries could not be executed before the fleet-wide pacing budget closed - logged as blocked, not as a negative result. The only 'asbestos aboard' material located is law-firm marketing content asserting asbestos on landing craft generically without primary sourcing - excluded by source policy.
    Verification
    verified
    Role
    negative_finding
    Documentation level
    ship_specific
    Accessed
    2026-09-30
    Study period
    2026-09-30
    Limitations
    Absence of a located public record does not prove absence of asbestos aboard - and the litigation repository search is incomplete (all docket searches unexecuted, though every opinion-variant query returned zero). Deck logs, Commercial Iron Works work packages, the JMSDF service file, and the post-1958 disposal record are undigitized or unlocated leads. Does not establish or defeat any claim of exposure or legal eligibility.
    Atlas source
    true
    Evidence ID
    ev-uss-lcs-l-3-103-lcsl3103-08

Attribution

Compiled by
Paul Danziger; Rod de Llano
Publisher
Danziger & De Llano, LLP
License
CC-BY-4.0
Citation
Danziger, P., and De Llano, R. (2026). AsbestosAtlas Navy Vessel Asbestos Exposure Dataset. Danziger & De Llano, LLP. DOI: not yet assigned
Dataset version
asbestosatlas-ships-2026.10.12-rc.1
DOI
not yet assigned